Baked material
——
Import desiccant dryer ensure low moisture content
Injection molding production solution
Imported electric injection molding machine to ensure the accuracy

Injection molding
——
● Injection molding
Molding process lock
——
Lock molding process, rely on mold and equipment to ensure stability
● Quality control
Injection molding
Physical area differentiation
————
Every 3 months in molding production
Water content testing of raw materials
————
Every 3 months in molding production Water content testing of raw materials

————
Every 4 hours appearance confirmed the appearance of the mould

————
Trend control of product size


————
Daily product weight confirm, structure chip creations
01

Verify the matching of mold and process parameters

The application of central monitoring management mode (iNet management software), strictly control the process parameters, record and reflect the whole process data, quality analysis more fully

● Injection control management

Device temperature monitoring data
02
03
Solution
Molding Processing and Manufacturing Solution
Address: No.7588, Hangnan Road
E-mail:maoyj@xxyhmj.com.cn
Zip code:201400
website qrcode

Check mobile website

IR
©2021 Shanghai Yahong Mould Co., LTD Copyright
Technical support:建站之家
7x24 hour service hotline
021-57405000
IR
Contact
 
 
| Contact us
Addreqs:  No.7588, Hangnan Road
E-mail:maoyj@xxyhmj.com.cn
Zip code:201400
Shanghai Yahong Mould Co., LTD
021-57405000
| Message
venice
website qrcode